2011-07-05

Longgang Line Shenzhen Metro Line 3

Longgang Line will run 41.8 km with 30 stations from Hongling to Yitian Village and will be built in two phases.

Construction on Phase I which runs 32.86 km from Caopu to Shuanglong began on 26 December 2005. Phase I was completed on 28 December 2010.

The entire line is scheduled to open 30 June 2011.It will connect with Luobao Line at Laojie and Shopping Park, with Shekou Line at Futian, with Longhua Line at Children's Palace, with Huanzhong Line at Buji and run out to Longgang in the north-east of the city.

The line is operated by Shenzhen Metro No.3 Line Operations Branch Corporation

* 28 December 2010: Caopu - Shuanglong

* 16 June 2011: Yitian – Caopu

Longgang Line Shenzhen Metro - OnChinaTours

Label: Shenzhen Metro

keywords: Shenzhen Airlines, Shenzhen Metro,Shenzhen Tours,Shenzhen Travel,OnChinaTours

0 comments:

Post a Comment