Shenzhen tours Shenzhen Metro or subway

Luobao Line

Luobao Line of the Metro runs westward from Luohu to Shenzhen University.
Trains operate at 3 to 4 minute frequency during peak hours and 5 to 6 minute frequencies at other times. An electronic signboard system displays estimated train arrival times. All stations in Luobao Line are underground. An extension to Airport East is under construction. Trial runs from Shenzhen University
Station in Nanshan District to Xixiang Station in Bao’an District have started in December 2010. The extension of Luobao Line to the airport will open in June 2011.

Shekou Line

It will run from Chiwan to Window of the World, where it will connect with Luobao Line.
Construction of Shekou Line Phase 1 has commenced. Phase 2 will run from Window of the World north of Luobao Line and will connect with Longhua Line at Civic Center and with Luobao Line again at Huaqiang Rd. Phase I of Shekou Line was open on 28 December 2010.

Longgang Line

It will run 41.8 km with 30 stations from Hongling to Yitian Village and will be built in two phases.
Construction on Phase I which runs 32.86 km from Caopu to Shuanglong began on 26 December 2005.Phase I was completed on 28 December 2010. The entire line is scheduled to open 30 June 2011.It will connect with Luobao Line at Guomao and Shopping Park and run out to Longgang in the north-east of the city.

Longhua Line

Longhua Line of the Metro runs northward from Futian Checkpoint to Children's Palace.
Trains operate at 10 minute frequencies at all times. There are electronic signboard system which display estimated train arrival times and all stations in Longhua Line are underground. North of Children's Palace, an extension to Qinghu in Longhua, Bao'an District is being constructed, and is expected to complete in 2011.

Guangdong province shenzhen city-OnChinaTours (It's all on us if you're on China tours.)